HYDROELECTRIC ENERGY
Senerji Enerji Üretim A.Ş.
We generate energy at the Güllübağ and Bayramhacılı hydroelectric power plants.
DiscoverSENERJİ
The power of water. A shared future.
Senerji Enerji Üretim A.Ş., part of ARY Holding, is an active energy producer with hydroelectric power plants totalling 143 MW of installed capacity.
The Güllübağ plant in İspir, Erzurum and the Bayramhacılı plant in Avanos, Nevşehir meet the daily electricity needs of 86,446 people.
Get to know Senerji

CORPORATE
With ARY Holding, toward the same future.
Senerji Enerji is a subsidiary of ARY Holding, which has led industrial transformation for more than 60 years.
Discover ARY HoldingGALLERY
From dam to grid. Together further.
Moments from the Güllübağ and Bayramhacılı plants and from work in the field.



- Hydroelectric plants
- 2
- Generation capacity
- 143MW
- Combined annual energy production
- 380GWh
- People whose daily electricity needs are met
- 86.446
- Güllübağ Dam and HPP, per Ministry of Forestry and Water Affairs statement
OUR PLANTS
Hydroelectric power plants



03
Social responsibility
Afforestation and landscaping work at the Güllübağ and Bayramhacılı plant sites.
See the work
HISTORY
Deep roots. Shared future.
ARY Holding’s journey since 1963 and Senerji’s steps in energy.
1963
ARY Holding
A foundation laid in Samsun
A construction materials trading company founded as Garip Yıldırım and Sons became the foundation of ARY Holding.
1980s
ARY Holding
Becoming an industrial force
Under Ali Rıza Yıldırım’s leadership the entrepreneurial spirit spread into key sectors and shaped Türkiye’s industrial map.
2010
ARY Holding
Entering the energy sector
ARY Holding entered the energy sector, laying the groundwork for its hydroelectric investments.
2011
Senerji
Bayramhacılı HPP online
The Bayramhacılı Dam and HPP in Avanos, Nevşehir was commissioned in 2011.
2012
Senerji
Güllübağ HPP online
The Güllübağ Dam and HPP in İspir, Erzurum was commissioned in 2012.
2015
Senerji
Testing and Maintenance Services
The Testing and Maintenance Services unit began serving industrial facilities across Türkiye in 2015.
FROM SENERJİ
News & developments

NEWS
Inspections held at Güllübağ Dam and HPP, Erzurum’s third-largest power plant
DSİ 8th Regional Director Bahtiyar Kabadayı inspected the Güllübağ Dam and HPP on site.
Read the story
NEWS
Güllübağ Dam and HPP lights up the east
Minister Eroğlu: Güllübağ Dam and HPP meets the daily electricity needs of 86,446 people.
Read the story
NEWS
Güllübağ Dam and HPP continues to light up the east
The Güllübağ Dam and HPP meets the energy needs of about 87,000 people.
Read the story