Senerji hydroelectric power plant and dam facilities

HYDROELECTRIC ENERGY

Senerji Enerji Üretim A.Ş.

We generate energy at the Güllübağ and Bayramhacılı hydroelectric power plants.

Discover
OUR PLANTSHydroelectric energy generation.

SENERJİ

The power of water. A shared future.

Senerji Enerji Üretim A.Ş., part of ARY Holding, is an active energy producer with hydroelectric power plants totalling 143 MW of installed capacity.

The Güllübağ plant in İspir, Erzurum and the Bayramhacılı plant in Avanos, Nevşehir meet the daily electricity needs of 86,446 people.

Get to know Senerji
Güllübağ HPP dam and power plant
ARY Holding logo

CORPORATE

With ARY Holding, toward the same future.

Senerji Enerji is a subsidiary of ARY Holding, which has led industrial transformation for more than 60 years.

Discover ARY Holding
Hydroelectric plants
2
Generation capacity
143MW
Combined annual energy production
380GWh
People whose daily electricity needs are met
86.446
Güllübağ Dam and HPP, per Ministry of Forestry and Water Affairs statement

OUR PLANTS

Hydroelectric power plants

Bayramhacılı Dam and HPP

02 / 02

Bayramhacılı HPP

Nevşehir / Avanos · Kızılırmak · 47 MW

Explore the plant
Saplings planted around the plant

03

Social responsibility

Afforestation and landscaping work at the Güllübağ and Bayramhacılı plant sites.

See the work

HISTORY

Deep roots. Shared future.

ARY Holding’s journey since 1963 and Senerji’s steps in energy.

  1. 1963

    ARY Holding

    A foundation laid in Samsun

    A construction materials trading company founded as Garip Yıldırım and Sons became the foundation of ARY Holding.

  2. 1980s

    ARY Holding

    Becoming an industrial force

    Under Ali Rıza Yıldırım’s leadership the entrepreneurial spirit spread into key sectors and shaped Türkiye’s industrial map.

  3. 2010

    ARY Holding

    Entering the energy sector

    ARY Holding entered the energy sector, laying the groundwork for its hydroelectric investments.

  4. 2011

    Senerji

    Bayramhacılı HPP online

    The Bayramhacılı Dam and HPP in Avanos, Nevşehir was commissioned in 2011.

  5. 2012

    Senerji

    Güllübağ HPP online

    The Güllübağ Dam and HPP in İspir, Erzurum was commissioned in 2012.

  6. 2015

    Senerji

    Testing and Maintenance Services

    The Testing and Maintenance Services unit began serving industrial facilities across Türkiye in 2015.

FROM SENERJİ