Güllübağ Dam and plant

HES

Güllübağ HPP

96 MW installed capacity on the Çoruh River in İspir, Erzurum.

Home

HES

The Güllübağ Dam and HPP is located within the borders of Erzurum province, 6 km east of the İspir district, on the Çoruh River. The plant, with 96 MW of installed capacity, was commissioned on 23.03.2012; the dam is of the roller-compacted concrete (RCC) type.

Installed capacity
96MW
Annual energy production
313.90GWh
Commissioned
2012

General information

General information
ItemValue
LocationErzurum / İspir
Basin / riverÇoruh
Installed capacity96 MWe
Annual energy production313.90 GWh
Average annual energy production280 GWh
Dam typeRCC (roller-compacted concrete)
Net head97 m
Commissioning date23.03.2012

Reservoir and dam

Reservoir and dam
ItemValue
Minimum operating level1133 m
Maximum operating level1147 m
Total storage capacity20.75 hm³
Active storage capacity11.33 hm³
Crest length92 m
Thalweg elevation1090 m
Height above thalweg61.50 m
Height above foundation71.50 m

Energy tunnel, penstock and surge tank

Energy tunnel, penstock and surge tank
ItemValue
Energy tunnel typeCircular
Design capacity113 m³/s
Tunnel diameter6 m
Tunnel length3,246.55 m
Penstock diameter5.00 m / 2.60 m
Penstock length118.31 m
Surge tank typeCircular
Surge tank top elevation1,172.00 m
Surge tank bottom elevation1,100.50 m
Surge tank inner diameter17.00 m

Powerhouse, turbines and generators

Powerhouse, turbines and generators
ItemValue
Powerhouse typeSemi-buried
Installed capacity96 MW
Tailwater elevation1,042.00 m
Design discharge113 m³/s
Turbines3 vertical-axis Francis units, 272.72 rpm
Generators3 vertical-axis, salient-pole, 3-phase synchronous units; 3 × 38 MVA
Output voltage13.8 kV
Frequency50 Hz
SwitchyardOpen type, 154 kV
Güllübağ HPP facilities
GÜLLÜBAĞ HPP

Güllübağ HPP photo 1

Güllübağ HPP facilities
GÜLLÜBAĞ HPP

Güllübağ HPP photo 2

Güllübağ HPP facilities
GÜLLÜBAĞ HPP

Güllübağ HPP photo 3

Güllübağ HPP facilities
GÜLLÜBAĞ HPP

Güllübağ HPP photo 4

Güllübağ HPP facilities
GÜLLÜBAĞ HPP

Güllübağ HPP photo 5

GÜLLÜBAĞ HPP

EPDK Generation License

Generation license (No. EÜ/1054-1/770) issued by the Energy Market Regulatory Authority to Senerji Enerji Üretim A.Ş. for the Güllübağ Dam and Hydroelectric Power Plant in Erzurum, valid for 49 years from 11.01.2007.

Download document