SENERJİ
The power of water. A shared future.
Senerji Enerji Üretim A.Ş., part of ARY Holding, is an active energy producer with hydroelectric power plants totalling 143 MW of installed capacity.
The Güllübağ plant in İspir, Erzurum and the Bayramhacılı plant in Avanos, Nevşehir meet the daily electricity needs of 86,446 people.


CORPORATE
With ARY Holding, toward the same future.
Senerji Enerji is a subsidiary of ARY Holding, which has led industrial transformation for more than 60 years.
Discover ARY HoldingGALLERY
From dam to grid. Together further.
Moments from the Güllübağ and Bayramhacılı plants and from work in the field.



SENERJİ
At the source of water. Beside the grid.
Senerji Enerji Üretim A.Ş. is an energy producer operating the Bayramhacılı Dam and Güllübağ Dam hydroelectric power plants under ARY Holding.
The two plants have a combined 143 MW of installed capacity and an annual production capacity of about 380 GWh.
JOURNEY IN ENERGY
From 2010 onward, following energy.
In the energy sector ARY Holding entered in 2010, the Bayramhacılı Dam and HPP was commissioned in 2011 and the Güllübağ Dam and HPP in 2012.
HISTORY
Deep roots. Shared future.
ARY Holding’s journey since 1963 and Senerji’s steps in energy.
1963
ARY Holding
A foundation laid in Samsun
A construction materials trading company founded as Garip Yıldırım and Sons became the foundation of ARY Holding.
1980s
ARY Holding
Becoming an industrial force
Under Ali Rıza Yıldırım’s leadership the entrepreneurial spirit spread into key sectors and shaped Türkiye’s industrial map.
2010
ARY Holding
Entering the energy sector
ARY Holding entered the energy sector, laying the groundwork for its hydroelectric investments.
2011
Senerji
Bayramhacılı HPP online
The Bayramhacılı Dam and HPP in Avanos, Nevşehir was commissioned in 2011.
2012
Senerji
Güllübağ HPP online
The Güllübağ Dam and HPP in İspir, Erzurum was commissioned in 2012.
2015
Senerji
Testing and Maintenance Services
The Testing and Maintenance Services unit began serving industrial facilities across Türkiye in 2015.